thenewswire.com · Dec 10, 2025
Peloton Completes the Maiden Drilling Program at the North Elko Lithium Project, Nevada
December 10, 2025 – TheNewswire - London, Ontario – Peloton Minerals Corporation (“Peloton” or the “Company”) (CSE Symbol: PMC; OTCQB Symbol: PMCCF)) is pleased to announce the successful completion of the maiden drilling program on the Company's 100% owned North Elko Lithium Project (NELP) located in northeastern Nevada. The four-hole program, totaling 1,825 feet, successfully achieved all of its objectives: confirming the near surface presence of clay or clay bearing material (“Clay Layers”) to a vertical depth of at least 500 feet; confirming the presence of Clay Layers across a widespread area with drill spacing measuring 7 by 3.5 kilometers in this program; providing data on the orientation and stratigraphy of the Clay Layers; and obtaining samples to analyze for the presence of lithium or other critical minerals.

